Hose clip manufacturers JCS Hi-Torque had recently had two new air compressors installed at their warehouse in Sudbury.
Thermalair were called in when it was apparent that the new air compressors were producing a lot of heat, causing the temperature of the warehouse to increase and become extremely hot.
After a site visit and assessment, our recommendation was to utilise the existing warehouse ducting to extract the hot air directly outside.
Our alterations greatly improved the surrounding warehouse conditions and also the temperatures in which the compressors are working in.