Our customer Alan Bartlett & Sons needed to improve the heating in their large warehouse and picking areas. This may seem a simple requirement but it was complicated by these factors: The picking area had to remain operational while we were working, so significant Health and Safety issues had to be overcome. The oil pump...

Project Overview This project was to install an entirely new ventilation system in a newly built specialist school in Chigwell (Anderson Group). The system was required to deliver warmth in colder months, and fresh filtered air continuously. The goal was also to improve the indoor air quality reducing dust and allergen levels. An additional cooling...

Our client Chemours, global producers of industrial chemicals, recently called our installation team in to replace two floor standing heaters which had damaged heat exchangers at their Meekings Road warehouse in Sudbury. The defective heat exchangers had corroded over time due mainly to the atmospheric conditions they had been subjected to. Following a site assessment and our subsequent...

Project Overview Care UK, a major provider of services to the healthcare industry approached Thermalair requesting a redesign and replacement of their existing heating, cooling and ventilation infrastructure. With more than 350 employees working in the building, precise logistics and planning was essential. Proposal We proposed decommissioning and fitting the new units in stages, ensuring...

The job required us to step in when one of the onsite Fillers main bearing seized. The Arla Engineers needed to act quickly to get the unit back up and working, maintaining the production in the factory. On contacting the regular lifting company to help lift the filler to access the bearing, the response time was...

Our current customer Alfred Franks & Barlett PLC (AfB), for whom we regularly carry out gas works, recently contacted our Sales Director asking whether we could help identify and repair a leak with water coming into their warehouse building via the roof valleys in the roof line,  causing damage to the  stock in the area directly below....

Hose clip manufacturers JCS Hi-Torque had recently had two new air compressors installed at their warehouse in Sudbury. Thermalair were called in when it was apparent that the new air compressors were producing a lot of heat, causing the temperature of the warehouse to increase and become extremely hot. After a site visit and assessment,...