Oil Pump and Heating in a Warehouse Our customer Alan Bartlett & Sons needed to improve the heating in their large warehouse and picking areas. The meant installing an oil pump heating system in their large warehouse. This may sound simple. However, the complicating factors are as follows: The picking area had to remain operational...

Our client Chemours are global producers of industrial chemicals. They recently called our installation team in to replace two floor standing heaters which had damaged heat exchangers. This was at their Meekings Road warehouse in Sudbury. Due to atmospheric conditions, the defective heat exchangers installation had corroded over time. Following a site assessment, and our subsequent recommendations,...

This project was for Heating, Cooling and Ventilation System installation for Care UK Headquarters. Project Overview Care UK is a major provider of services to the healthcare industry. Due to their complicated business needs, They approached Thermalair requesting a redesign and replacement of their existing heating, cooling and ventilation system. Owing to the size of...

Refrigeration Condenser Project Whilst carrying out routine maintenance at Arla Foods, we made the client aware that their ageing refrigeration condenser. The Friga-Bohn condensers were reaching the end of their and replacement before they failed completely. As a critical item in their production process up-time is paramount. Arla produce milk and cream. These dairy products...

The job required us to step in when one of the onsite Fillers main bearing seized. The Arla Engineers needed to act quickly to get the unit back up and working, maintaining the production in the factory. Our regular lifting company were unable to respond in time. With current workload this situation was untenable. We contacted...

Our current customer Alfred Franks & Barlett PLC (AfB), for whom we regularly carry out gas works, recently contacted our Sales Director asking whether we could help identify and repair a leak with water coming into their warehouse building via the roof valleys in the roof line,  causing damage to the  stock in the area directly below....

Hose clip manufacturers JCS Hi-Torque had recently had two new air compressors installed at their warehouse in Sudbury. Thermalair were called in when it was apparent that the new air compressors were producing a lot of heat, causing the temperature of the warehouse to increase and become extremely hot. After a site visit and assessment,...